Painted, ripped out old carpet, discovered green linoleum floors, painted the floors, bought a rug, assembled the crib, painted the stairs, and pulled up the carpet in the hallway. The hallway is still under construction so I will talk about that in another post but here are some nursery pictures! I still have to hang pictures, shelves and art.
Before
green linoleum
painted linoleum (lee's brilliant idea)
new rug with blue hallway carpet that has been removed and notice the doorway has no door. That has been fixed!
More pics to come. We have had workers over the past two days hanging dry wall in the stair well/hall and putting up a door to her room. None of the rooms upstairs have doors, we aren't sure of the reason but thought it necessary if we actually want her to sleep:) We had a great time putting everything together and I am sad to see Seta go. She was a big help and kept me sane while I freaked out about the green linoleum.